Skip to content
  • Tel: 01934 835672
  • Pipes On Sight
  • Email:

Pipework Mapping Schemes

Mapping Phase Schemes

Mapping schemes are designed to perate in either the 'Mapping' or 'Maintenance' phases of survey work. The mapping phase is where systems are subject to initial information gathering and drawing production. The maintenance phase is designed to keep these drawings up to date, ensuring that any modifications to systems are captured and drawings kept up to date and accurate.

We can tailor our 'Mapping' or 'Maintenance' schemes to suit your requirements or budget so please give us a call and we will be happy to discuss all options with you or arrange a meeting with you on site where we can go through things in detail.

What is included
  • "Sight Packs"are designed to keep your drawings contained in one place with all the relevant information inside each 'Sight Pack' to keep your drawings controlled and up to date
  • "Websight" gives you access to your drawings and documentation in a password protected area on our website. This is perfect if asked to supply up to date information during audits or ensuring that anyone who needs access to information can do so easily. Multiple users can be set up with access and temporary access can also be granted to contractors working on your site.
  • "Monitor Mate" is included with all of our site packs and helps to ease the burden of maintaining and updating your drawings. Accurate content and good condition of your 'Sight Pack' ensures that your drawings remain a usefull tool.
  • "Labelling" is something that is lacking or innacurate on many sites. We can provide you with easy to apply single label roll that when applied with the aid of our drawings provides you a clear and accurate visual guide to your pipework systems

Map and Mark 36

Runs for a 36 month period
Twelve site visits per year
One site visit per month
FREE labelling of one system
36 monthly payments
No price increases over 36 months guaranteed

Mapper 12

Runs for a 12 month period
Twelve site visits per year
One site visit per month
FREE labelling within 50m roll
12 monthly payments


Maintenance Phase Schemes

Repeating annual contract schemes designed to keep your valuable pipework and system records and drawings up to date, often as part of governance and compliance policies in areas like health and safety.

Maintenance 6

Runs for a 12 month period
Six site visits per year
One site visit every other month
System labelling at reduced cost
12 monthly payments

Maintenance 4

Runs for a 12 month period
Four site visits per year
One site visit every quarter
System labelling at reduced cost
12 monthly payments

Maintenance 2

Runs for a 12 month period
Two site visits per year
One site visit every six months
System labelling at reduced cost
12 monthly payments

 
Top